Project Information

picture of calendar
Timeframe

picture of public meeting
Public & Stakeholder Engagement

picture of notebook and pen
Background Information
picture of a meadow
Environmental Assessment
picture of documents
Project Documents

Copyright 2021, All rights reserved

Ryan Hanley, 1 Galway Business Park, Dangan, Galway, H91 A3EF

Phone: +353 91 587116

Email:southgalwayfrs@ryanhanley.ie

Privacy Statement

Accessibility Statement

 

Latest news

February 2022
Geotechnical investigations have made substantial progress in the South Galway area over the past months and are due to be completed on site by April 2022.

October 2021
Irish Drilling Ltd has been appointed to carry out geotechnical investigations in the South Galway area over the coming months.September 2021

Environmental baseline surveys are ongoing in the study area. A geotechnical investigation is scheduled to commence in October.

June 2021
Site visits have been taking place this month between the design team and those who have expressed an interest in a site based meeting. Environmental baseline surveys are also taking place in the study area.

May 2021
Galway County Council has now advertised that there will be a further period of consultation (from 28 May to 26 June 2021). A limited number of site meetings may take place in June due to the gradual easing of Covid-19 restrictions, and arrangements are currently being made to set up socially distanced meetings between the design team and those who have expressed an interest in a site based meeting. Requests for site meetings with the design team can be made via the project email address: southgalwayFrs@ryanhanley.ie.

April 2021
Further Period of Consultation
While the initial consultation period has concluded, there will be a further period of consultation during which meetings can take place on site (see Minister’s Press Release). The timing of the additional period is dependent on the easing of Covid-19 restrictions.

April 2021
Some Frequently Asked Questions have been added to the website.

February 2021
Galway County Council and the OPW are now presenting the Emerging Preferred Scheme for public consultation. Brochures advertising the consultation have been posted to homes and businesses within the Study Area, however due to current COVID-19 restrictions, the 2021 public consultation is taking place online. Check out the Public & Stakeholder Engagement page on this website for futher details.


February 2021
The Feasibility Report, is now available to view at the following link, together with supporting flood risk mapping and drawings.

February 2021
The TCD Gort Lowlands Groundwater Flood Modelling Project Report is now available to download the GSI website at the following link.
https://www.gsi.ie/en-ie/publications/Pages/Gort-Lowlands-Groundwater-Flood-Modelling.aspx

December 2020
Stakeholder consultations have taken place in October and November 2020.  It is intended that a public consultation will commence in Q1 2021, with further details to follow.

December 2020
The South Galway area featured on a recent RTE programme 10 Things to Know About…., Episode 4 on 30 November 2020.

2 October 2020
The Feasibility Study for the scheme is nearing completion and a potential Scheme (potentially environmentally acceptable and cost beneficial) has been identified.
This is the first time a potentially feasible solution has been identified to resolve the flooding issues in the South Galway (Gort Lowlands) area.

The project team will now progress the Options Assessment of the scheme in advance of public consultation, further details of which will be announced.

May 2018
The first Public Consultation Day for South Galway (Gort Lowlands) Flood Relief Scheme took place on the 3 May 2018. Follow this link for further details.

  • Home
  • Project Information
    • Timeframe
    • Public & Stakeholder Engagement
    • Background Information
    • Environmental Assessment
    • Project Documents
  • News
  • Gallery
  • Resources
    • Contact Us
    • FAQ
    • Glossary
South Galway (Gort Lowlands) Flood Relief Scheme Proudly powered by WordPress